Guest Room Re-Do

Guest room 'before'
THIS COMING WEEK, I’M SLIPPING IN A RENOVATION PROJECT that wasn’t even on my priority list. The roofer remains elusive, and I can’t do the parking court until he’s done. I can’t do the deck/outdoor shower until April at least, because the area beneath which I plan to put the 400-square-foot deck is filled with ferns, below, that were the most satisfying part of the landscape when I got here last May, as well as 75 daffodil bulbs, chelone (turtlehead), and astilbes. (I’ll move all that elsewhere, but can’t do it until the ground is good and unfrozen.)

Where the new deck will go
Like a shark, I’ve got to keep moving forward or else I’ll die. Or so it feels. So on Tuesday, a contractor is coming to fix up the 2nd bedroom, or guest room, in my East Hampton cottage. He’ll install a new window I happen to have in the basement, below (custom-made for another house and never used) along the longer wall, which I expect will make the 7-foot-wide room feel much more pleasant. It will also look more interesting from the outside. He’ll remove cruddy molding, a damaged ceiling from a long-ago roof leak, and replace the old, wallpapered-over sheetrock and baseboard.

Window going in
I’m also getting three new solid wood, four-panel doors to replace the hollow-core ones on the two bedrooms and bath.
I’m kind of dreading the whole operation, to tell ya the truth. It’ll last most of the week. It’s been very cold here, and the exterior wall in that room will be open for at least a few hours. And then there’s the dust. But hopefully the satisfaction of accomplishment will trump the inconvenience.
And now the roofer is saying he may also come this week. Chaos!

