Dales Peak shapes up
Continuing with the landscaping push, I have turned my attention to the 'Dales Peak' side of the layout. This is where the 'Dales Peak Cement' works will be situated, (on the upper level) from which the layout takes its name.
An aerial view of the landscaping work that's been done on the 'Dales Peak' side of the layout. A Class 170 'Turbostar' is snaking its way back down the 'Dales Peak' branchline and the double track mainline can be seen in the foreground. 'The Dales Peak Cement' works will be on the upper level at the back.
The cardboard landscape lattice work in place, and some of the 'Dales Peak Cement' works buildings in the background.
Looking along the return section of the 'Dales Peak' branchline with the slope of the landscape skeleton clearly visible.