January 7th, 2008

Back on track


I have continued with the track laying today, and also made a start at introducing some contours. The double track mainline is now in place through the tunnel under the inclines. I needed to do these first because they would be impossible to lay once the landscaping starts.

2007-12-08-03-500px.jpg
With the help of a hot melt glue gun I have stuck the tunnel portal in place and roughed out the start of the hillside with a lattice of cardboard.

2007-12-15-01-500px.jpg
This view shows how the hillside will be cut away in the foreground to accommodate the two tracks at the wharf side.

2007-12-15-02-500px.jpg
A wider view of the trackwork and hillside. Nothing is wired up as yet though.

2007-12-15-03-500px.jpg
Looking the otherway towards where the upper level will emerge from another tunnel and cross the viaduct.

Comments are closed.

Buy generic drugs online: buy cheap viagra
Buy Erectile Disfunction drugs Online Buy Cheap Generic Viagra Online